LNG containerized plant

  • LNG Plant Daily Capacity 50000NM3/D

    1. Simple technical process with MRC technology, less land occupation with skid-mounted design, easy installation and operation, low investment from China manufacturer; 2. Flexible gas flow for gas source with unstable pressure, equipment with great adaptability for different gas composition, bigger operating capacity range; 3. Suitable for remote area working condition that lack of water, power source. The whole system high automation grade and remote monitoring. 4. The unique electromechanical connection bridge technology make the installation no need welding on site, all the skid can be installed or disassembled within 20~50 days; 5. Transportable design, maximize use ratio of the equipment.

    Email Details
Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy