highly integrated lng emergency gas supply skid

  • LNG Fast Supply Equipment

    Feature: 1. LNG skid mounted regasification station flow capacity can be designed from 1,000 Nm³/hr to 20,000 Nm³/hr. 2. LNG transfer to gas in 30 minutes, highly integrated equipment, super easy installation; 3. 20FT skid flow capacity reach to 1,000Nm³/hr, 40FT skid flow capacity reach to 5,000Nm³/hr , it can be designed as transportable equipment; 4. Perfect solution for LNG gas peak shaving and emergency gas supply; 5. For big flow capacity peak shaving station, like 10,000 Nm³/hr to 20,000 Nm³/hr, total investment one tenth of traditional ambient temperature evaporator solution; 6. LNG gas quick supply system with over pressure, over temperature ESD system and Low water level, gas leakage alarm system available. Automatic PLC control; 7. One skid integrated LNG defuel booster, heat exchanger, burner, LNG evaporator, pressure regulator, chimney etc, all in one solution; 8. LNG/LPG dual fuel available.

    Email Details
Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy