LNG Regasification Station

  • LNG regasification station

    LNG regasification station

    Brand Sinogas repower
    Product origin China
    Delivery time 30 days
    Supply capacity 1000 units per year

    LNG regasification skid is Skid-mounted design that make the transportation and move easily, also has good maneuverability. Highly integrated and integrated design, small occupying area, easily on-site installation and put into production quickly.

    Email Details
  • LNG Fast Supply Regasification Station

    LNG Fast Supply Regasification Station

    Brand : Repowergas
    Product origin : China
    Delivery time : 30-40 days
    Supply capacity : 10 units per month
    Feature:
    1. LNG skid mounted regasification station flow capacity can be designed from 1,000 Nm³/hr to 20,000 Nm³/hr.
    2. LNG transfer to gas in 30 minutes, highly integrated equipment, super easy installation;
    3. 20FT skid flow capacity reach to 1,000Nm³/hr, 40FT skid flow capacity reach to 5,000Nm³/hr , it can be designed as transportable equipment;
    4. Perfect solution for LNG gas peak shaving and emergency gas supply;
    5. For big flow capacity peak shaving station, like 10,000 Nm³/hr to 20,000 Nm³/hr, total investment one tenth of traditional ambient temperature evaporator solution;
    6. LNG gas quick supply system with over pressure, over temperature ESD system and Low water level, gas leakage alarm system available. Automatic PLC control;
    7. One skid integrated LNG defuel booster, heat exchanger, burner, LNG evaporator, pressure regulator, chimney etc, all in one solution;
    8. LNG/LPG dual fuel available.

    Email Details
Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy